Key Takeaways
- 10 Marla grey structure (G+1, ~3,600 sqft): PKR 1.17-1.35 Crore.
- 10 Marla turnkey: PKR 1.85-2.75 Crore depending on finishes.
- Timeline: 9-12 months grey structure, 12-15 months turnkey.
- Best 10 Marla activity right now: Phase 7, Phase 8, Phase 9 Town and DHA EME.
What does a 10 Marla house cost in DHA Lahore in 2026?
A 10 Marla house (Ground + 1, about 3,600 sqft covered) costs PKR 1.17-1.35 Crore for grey structure and PKR 1.85 to 2.75 Crore for full turnkey in DHA Lahore in 2026. The spread depends almost entirely on finishing grade, the structure cost is nearly identical for every home.
Which phases have the most 10 Marla construction?
Phase 7 and Phase 8 lead new 10 Marla builds on fresh possession. Phase 9 Town is the affordable entry into DHA proper, and DHA EME offers developed infrastructure on Multan Road. Rebuilds dominate Phase 1 through Phase 4.
Can I build a 10 Marla house in phases to spread the cost?
Yes, this is common. Complete the grey structure first (PKR 1.17-1.35 Crore), let it settle, then finish room by room as budget allows. One team for both stages avoids warranty gaps, but there is no obligation.
What should be in my 10 Marla construction contract?
Insist on four things: an itemised BOQ naming every material by brand and grade; milestone-based payments (never large advances); a written timeline with penalties; and cube-test results for every concrete pour. Read 7 costly mistakes to avoid before you sign.
Get your exact figure: cost calculator or a free 48-hour BOQ via contact.